Apply mortar so that it extends 1 ½ inches on each side of the joints. There should be a ¼ inch between the board and the wall, and ⅛ inch between the backer board sheets.ĭrive screws in every 6-8 inches and around the perimeter. Position the rest of the sheets so that the four corners won’t meet. The joints in the backer should not line up with the joints in the subfloor. Use a self-leveler, and smooth it with a sander.Ī cement backer board can also be used to strengthen your hardwood floor. If your floor has low spots, you can use a wood filler, which can be purchased at a hardwood store and mixed with water to create a thick paste. Repeat this process underneath all of the squeaky areas. Use a four-by-four held underneath the one-by-four to hammer it into the joist, and then remove the four-by-four. Once you have inserted the shims, one-by-four floor floorboards can be set underneath the squeaky sections. Tap them in just enough so that the gap is filled. Once you have identified weak areas, shims, also known as spacers, can be hammered in. Walk on your floor and listen for any squeaky or spongy areas. Broken plumbing should be repaired, and stained areas should be replaced. Some plywood subfloors, such as interior-grade plywood or particleboard, will not work as foundations for tile installation.īefore tiling, check your plywood floor from the ground below it to look for cracks around plumbing fixtures.

#Install cement board over hardwood floor crack#

If the plywood bends under the load of the tiles, they could dislodge or crack easily. Plywood is an engineered sheet of wood that is made up of fine layers of wood veneers attached together, placing the grains at right angles to each other.Ī plywood subfloor should be structurally sound enough to support tile installation. The second coat should be applied perpendicular to the first coat.Ī sealer should take about three days to dry. It should be applied in dry conditions in two thin coats to ensure a smooth, even finish.

install cement board over hardwood floor

The floor should be blotted dry, and you should let it sit overnight before applying a sealer.Ī concrete sealer creates a bond between the cement and mortar that keeps mold away. Then rinse completely.Īn immaculate surface will ensure that your tile has a better bond with the subfloor. Use warm water mixed with decreasing cleaner to scrub concrete thoroughly with a scrub brush. To clean your cement floor, wet a mop with plain water. Use a trowel to smooth it down.Ī dirty floor can cause unevenness that will cause tile breakage in a short amount of time. Medium-sized cracks can be repaired with a concrete filler that can be found at your local hardware store.

install cement board over hardwood floor

If part of your subfloor needs to be replaced, it should be left to cure at least 28 days before tile installation. If a section has cracks, it should be removed and replaced with a more solid piece of floor. You should repair any cracks or uneven patches in your concrete floor, especially if you plan on bonding your tile directly to the subfloor. If the water penetrates and leaves a water spot, chances are that it can form a strong bond with tile.Ĭoncrete floor should have a coarse finish to bond with the thinnest for tile. To find out if your subfloor is sufficient, sprinkle some water in assorted places on the floor. If it is uneven, breakage will be much more likely, so it is important to create a surface that is fully supportive.Ī good concrete subfloor should be able to accept water penetration. If it is not, it won’t support tile well.Įven the smallest cracks or depressions in a concrete floor could cause your tile to break early.

#Install cement board over hardwood floor free#

A good subfloor needs to be durable, level, at least 1 ⅛ inches thick, and free from residue. How can you prepare your subfloor for tile? Here are some ideas: Preparing a Concrete Subfloor for TileĬoncrete is made up of water, an aggregate such as rock, sand or gravel, and Portland cement.Ī subfloor is the bottom-most structural level of your floor. In order for your new floor to remain durable, it needs to be installed over a subfloor that won’t crack, loosen, or buckle. If possible, try to make sure all of your tiles have the same dye lot number, as well as the same model, tone and caliber. If you are interested in purchasing smaller tiles, look for a pre-mounted mesh backing to make installation easier.

#Install cement board over hardwood floor install#

Larger tiles can be easy to install (some times). Once you have chosen a shade, you should multiply the length by the width of your floor to find out how much tile you will need. The materials also hold up well when they are wet. They are strong, durable, and can last for decades. Porcelain and ceramic are materials that work beautifully for kitchen and bathroom floors. A new floor will add a gleaming, polished touch to your home, and it may not be as difficult as you think. Millions of homeowners would love the comfort, sophistication, and cleanliness of a renovated kitchen or bathroom. A recent study showed that 57% of Americans viewed their homes a “work in progress.”